Know your cost before you build
Most cost overruns start with a weak estimate or loose billing. JNR INFRA prepares detailed, item-wise quantities measured to IS 1200, backed by rate analysis — so you know the true cost of your project before the first pour, and every bill after that is checked against measurement.
Our QS services
- Detailed quantity take-off from architectural and structural drawings
- BOQ preparation as per IS 1200 methods of measurement
- Rate analysis and cost estimates for budgets and approvals
- Tender documents and contractor bid comparison
- R/A (running account) bill checking and certification
- Advance recovery, variation and final bill reconciliation
- Material reconciliation — cement, steel and RMC
How it works
1. DrawingsShare your architectural & structural drawings
2. Take-offItem-wise quantities measured to IS 1200
3. BOQ & estimateRates, abstract and total project cost
4. Cost controlBill checking and reconciliation during execution
Whether you are an owner building one house, a developer tendering a block, or a contractor preparing a bid, JNR INFRA gives you numbers you can rely on.